Ask questions and get answers about Celonis products from experts and peers.
Recently active
I'm trying to create anew skill using the documentation, but it looks like smart sensors are no longer available.What's now the alternative? Where can we find documentation on this topic? Thank you
Hi,I am trying to connect to pycelonis from my local system to IBC .It was possible with all the required values when it was 1.7.4But after the upgrade to 2.0 , we are getting a getaddrinfo errorIs anyone else facing such an issue?If so, What needs to be done.Let me knowThanks
Hi everyone, I want to add a PQL filter/ statement to my dashboard. I have an OLAP table with the results of multiple IBAN checks that runs every day (so the results are double, but with different dates). I want to add a filter to show the results only once with the newest date.
Hy guys,Is it possible to store whichever ID I select in profile view in a variable, if yes then which variable I should use runtime or view ?
In the analysis I've a kpi related to a 90th quantile that displays a value = 19.01, some filters are applied. Without any filter, the value is 19.49. Since I need to compare every instance in a table with that value, I stored it in a static value variable, that for some reasons shows the value 18.70. Another strange thing is that if I enter the code editor of the variable, the value displayed is 19.49, so coherent with the not filtered one in the analysis. Why it show me 18.70 outside the editor? And how I can apply the same filters on the variable in order to show the correct value of 19.01? (using case when condition met then compute quantile does not work, since there is the aggregation function error). Thanks!
Hi everyone, I am having troubles with variables in Views - both view variables and runtime.I want to set a target days and on change the value to be written to both ${target_ct_days} and ${{target_ct_days_runtime}} so that when I change target days, the bar chart to change simultaneously together with any KPIs which use the runtime variable. This is the YAML code for the input box. -If I have only ${target_ct_days} to be changed, the graphs are being changed accordingly. -But if I have both variables, graphs do not change, only the runtime variable: type: input-boxsettings: styles: position: horizontal: full vertical: top name: "" value: "" placeholderText: Enter Target CT days type: number onChange: update: variables: - name: target_ct_days - name: target_ct_days_runtime I would be thankful if someone advice me what should I do to update both variables so that graphs and KPIs change simultaneously. Thank you in advance!
Hello, I am using the Query Data module in an Action Flow. The output of the various date fields appears as below - instead of a regular date format like YYYY-MM-DD. How can I change the output of the column in Query Data?
Dear community members, We encountered a strange case where in SAP ECC in table MSEG we have a document with ‘PC’ as unit of measure (field MEINS) while after importing the data in Celonis we have ‘ST’ as unit of measure (see the attached images). Have you any similar issues? How did you solve it? Thank you!
Hi, i am just starting to familiarise myself with Celonis and have started with the Celonis Academy. Now I have a simple question. Currently I have this formula: COUNT(DISTINCT "OCH_Cases". "Party_Request_KEY")I want only values greater than 2 to be displayed. What should the formula look like then? Best regardsRene
What does dotted line means in the Process explorer?
Can someone help me with the YAML code or a reference for the implementation of a linear gauge graph like the one below in a View? It was taken from a trycelonis example. Thanks a lot,Dany
Error: Could not load screenshot. As the screenshot is non-zero, there should exist a screenshot that could not be loaded
I wanted to build an automated report tracking the number of logins / usage in celonis. How to do that? I know log gets created for all the activites in celonis. But I wanted to build the report out of that. Is it possible to do that in celonis.
Example: A(1)-C-B(1)-A(2)-B(2)-N-A(3); In this case I need the throughput time between A(1)->B(2). any ideas? For the rest it should show me values like C->B(1),B(2)->N and N->A(3) Currently I use something like the following DATEDIFF(dd, SOURCE ( "ACTIVITIES"."EVENTIME" ),TARGET( ( "ACTIVITIES"."EVENTIME" ))) However this works for the rest of the flow but for A(1)->B(2) it will just return 0
What does it mean if my happy path throughput time is more than average throughput time of the Process? Suppose my process takes 50 days in average, but my happy path takes 60 days. Is it bad?
Hi all, My interest is to calculate the THROUGH PUT time for all the desired set of process flows. I would like to view the distribution over a BOX PLOT. I am using the below approach.CASE WHEN PROCESS EQUALS 'event A' TO ANY TO 'eventB' then 'Process1'WHEN PROCESS EQUALS 'event B' TO ANY TO 'eventC' then 'Process2'ENDThe above formula will act as dimension axis for my box plot. I am calculating the tp time accordingly. However, since most of my cases(for e.x. 97%) satisfy the first condition, i cannot seem to calculate the tp time independently for other event or process correctly. The tp is calculated only for the remaining cases.Kindly suggest any other approach for the same. Thank you in advance :)
We are currently working on an implementation work where we are trying to capture two parrallel process using multi event log approach. But with the upcoming feature of Process Sphere we are trying to assess whether the multi event log will be replaced by Process Sphere due to its similarity. Need other people view and suggestions on the same.
any function used in pql to calculate days between the two date column such as in excel networkdays does (consider start date and end date , exclude weekends, ignore timestamps)
Is there any function in PQL which calculate days such as networkdays (used in excel and it will ignore timestamps, exclude weekends ,conside start and end date )does?
Dear Experts , We wanted to understand the possibility of integrating Celonis EMS platform with third party BPM application like ARIS Connect to transfer discovered BPMN model from Celonis EMS to ARIS BPM application. Thanks in Advance. Regards,Navalan Veerapandian
Hi team, Is there a way to make Pareto charts in Analysis or Views ?It does not appear to be off the shelf, just wondering if someone managed to build one. It is a quite comon tool used in the process improvement field. Thanks
What is the difference between an eventlog and digital footprint?
IS Business and Process Mining SpecialistABB Location: TBD, GlobalDescription: In this role you will be responsible to drive globalization, standardization, and automation of IS processes by leveraging strong business acumen and continuous improvement capabilities. (Check out the full description following the link) Apply here
Already have an account? Login