Skip to main content

Execution error: ERROR: Join [("27473006-d9c3-4d0c-8e36-7c4690ec4574_e04e1e0b-30e2-426d-ab63-bb9f5b0e5f2a".USR02 x "27473006-d9c3-4d0c-8e36-7c4690ec4574_e04e1e0b-30e2-426d-ab63-bb9f5b0e5f2a".CDHDR) 

using USR02_v1_b0 and previous join (PATH ID: 7)] inner partition did not fit in memory; value 100,BATCH]

Hi Kaveri,

 

Can I get more insight about the Transformation error? As I understand from Error, it is SAP ( CDHDR) table data. How many Values are you trying to move at a time ?

 

BR/VM


I believe it has huge data set , i am unable to check the count as well as its laoding from long time.

 

Details of activity:- 7 activity based upon cdhdr and cdpos

 

It has inner joins of vbak/vbap/vbep/cdpos/cdhdr and left join of usr02. How best i can optimise this.

 

I tried creating separate transformation of each activity but i get the same result.


Pls enable Debug mode, it will help you for further analysis.

 

Assume you have chosen the Option Right (standard) and reduce the Batch size to 50% for trail.

 

Hope it helps..Attached Screenshot.

 

Br/VM


Thanks but i am facing an issue with transformation not extraction . extraction has loaded successfully.


Share me the Transformation Program. Let me have look !

 

Screenshot 2021-09-20 at 16.37.51


It is Add Activity: Changes Schedule Line main one which is giving an issue

 

To test i have splitted same activity in 5 transformation w.rt activity and running , thinking it might help.

 

But yes please check Add Activity: Changes Schedule Line and help me how best i can optimise this


Reply