Show last load date of Process Model in analysis

Hi, is there a possibility to show the last load date of a process model in the analysis? Reason: The viewer should know when the last load of the process model took place.

Thank you in advance
Steffen

you can see the last load date in the analyses settings tab as shown in the screenshot.

[analyses settings.pdf|attachment]
(upload://kPusx5kJvOiMWPkNLfontVoWCcc.pdf) (55.1 KB)

Sorry. I can’t see the attachment.

image

the field “Last dataload” in the picture showing that the last data load completed 5 days back.

1 Like